---
title: "klarx for Data Center Construction and Data Center Projects"
description: "General contractors and EPCs in data center construction receive certified equipment at klarx, guaranteed availability and full documentation."
url: "/en/industries/data-center-construction"
lang: en
---

# klarx for data center construction and data center projects

Data centers are built under maximum time pressure – and every hour of downtime on the job site costs money. As a general contractor, EPC provider, or hyperscale builder, you need certified equipment exactly when your construction schedule requires it: from earthworks through structural construction and MEP installation to commissioning. klarx bundles cranes, lifting equipment, temporary power supply, containers, site facilities, and waste disposal with a single contract partner – with guaranteed availability, complete EHS documentation, and transparent digital cost tracking.

[Discovery Call](/en/discovery-call) [Request a rental](/en/mieten)

## On-time delivery with no downtime risk

Quick machine replacement and time-critical coordination keep your construction schedule on track – even when issues arise.

## Certification and EHS documentation

DGUV-tested machines, operator qualifications, and complete lifting and EHS records – audit-ready for every inspection.

## One partner for your entire job site

Cranes, work platforms, containers, power supply, waste disposal, and safety equipment from a single contact and contract.

# klarx is the solution for general contractors and EPCs in data center construction

You build colocation or hyperscale data centers, manage the structural work as a general contractor, coordinate technical building services as an EPC, or retrofit existing facilities? Data center construction has requirements that traditional construction projects don't face: tight milestones, a high proportion of heavy-load and modular assembly, strict safety and access rules, and complete documentation for operators and auditors. klarx understands these requirements from projects across Europe and handles complete equipment procurement for all construction phases – earthwork, structural work, MEP installation, commissioning, and retrofit.

Whether tower cranes and mobile cranes for HVAC module assembly, generators and switchgear, aerial work platforms and telehandlers for installation, temporary power supply, temporary structures and job site facilities, or disposal solutions – with more than 530,000 machines in 275 product categories, you get everything from one source at klarx. In addition to our machinery specialists, a dedicated expert team for crane and container projects supports you, planning crane positions, load zones, and assembly concepts together with your site management. Projects can be handled under NDA and according to your operator's safety requirements on request.

[Discovery Call](/en/discovery-call)

## Crane and project expertise

From 3D crane planning through lifting documentation to installation: Our crane team plans heavy lifts for transformers, generators, and prefab modules and coordinates trades on site.

## Guaranteed availability

klarx guarantees you equipment availability at the category level and delivers nationwide to any job site – even with short-notice changes in requirements.

## Cost control and transparency

With klarxMANAGER you see deployment times, costs, and documents per job site in real time – plus 1% discount on all orders placed through the platform.

# Working with klarx

---

## klarx Packages

Our packages lay out transparently which services, software features, and pricing conditions you receive.

[View packages](/en/benefits/packages)

## Construction Equipment Subscription

Rent construction equipment over a flexible term at a fixed rate, including insurance and delivery.

[Learn more about subscriptions](/en/rent/construction-equipment-subscription)

## klarxMANAGER

The digital solution that lets you rent and extend machines 24/7.

[Go to klarxMANAGER](/en/software/klarxmanager)

## Short-Term Rental

Need machines for 1 day to 40 days? Rent quickly and easily from us—we deliver to any job site across Germany.

[Request a rental](/en/mieten)

### 5 XL CRANES at a Data Center

For the construction of a data center in Raunheim near Frankfurt, klarx managed the complete tower crane package – over a project duration of 14 months. The scope of services ranged from 3D crane planning to lifting documentation and temporary power supply, through to EHS coordination as well as all logistics and assembly.

A WOLFF 6031.8 Clear, a Liebherr 630 EC-H20, and a Wotan X-treme 8040.20/2 were deployed. Weather protocols, defined restricted zones, and continuous on-site supervision were part of the integrated lifting concept.

- **Location:** Raunheim, Germany
- **Duration:** 14 months
- **Scope:** Full-service tower crane package
- **Services:** 3D crane planning, lifting documentation, temporary power supply, EHS coordination, logistics and assembly
- **Cranes deployed:** WOLFF 6031.8 Clear · Liebherr 630 EC-H20 · Wotan X-treme 8040.20/2

[[https://youtu.be/OfI4fjkJJXg?si=poGIuoxeFU1S_uRA]](https://youtu.be/OfI4fjkJJXg?si=poGIuoxeFU1S_uRA)

## Expertise

> klarx delivered an integrated crane solution tailored precisely to the requirements of a hyperscale project – including weather protocols, restricted zones, and continuous on-site supervision.
>
> — Oliver Wargalla, Head of Tower Cranes, klarx

# Knowledge, News and Trends

Discover our blog about equipment rental, construction machinery and trends in the construction industry.

---

## Sustainability in the Construction Industry

[Learn more now](/en/blog/sustainability-in-construction-challenges-and-solutions)

## Construction Trends for 2024

[Construction Industry 2024](/en/blog/construction-industry-2024)

## Solar Installation Projects

[Read now](/en/blog/solar-installation-projects-the-path-to-greater-sustainability)
