Are you planning, installing, or maintaining battery storage systems (BESS) – on open land, for commercial customers, or as part of grid projects? klarx understands the logistical requirements of these projects from numerous deployments across Germany and is your reliable partner for cranes, site facilities, and additional equipment – flexible, available, and from a single source.

From small storage units and transformer stations with 5 to 10 tons to large storage facilities with 42 tons and MV skids – we cover every project size.
For battery storage parks and large-scale projects, we handle engineering, crane studies, access planning, and logistical coordination.
From positioning containers and transformers on-site through interim storage and logistics from port to access planning with steel plates – everything through a single contact person.
Across Germany, we provide equipment multiple times per month in the context of battery storage systems, MV skids, and transformer stations – from open-field projects to urban solutions for e-charging stations to small-scale storage solutions. For large-scale facilities and battery parks, we leverage our cross-industry network and experience from major projects such as data center construction and large-scale PV projects.
BESS projects come with recurring challenges: tightly scheduled deliveries by international logistics providers, coordination of all project participants, lack of steel plates for road construction, and the availability of cranes and specialized trusses at the required time. klarx plans these factors from the start and secures the necessary resources for you early on.
Our network of mobile crane partner stations covers every location in Germany – reliable and flexibly available.
From access planning through crane studies to logistical coordination, we support your project from a single source.
We transfer established processes and standards from data center construction to BESS projects of any scale and provide you with proven, specialized partners when needed.
Battery storage parks with multiple large-scale storage systems and MV-skids up to 42 tons are among the most demanding projects in the BESS sector: multiple containers are installed one after another, crane studies and access planning with steel plates must be finalized in advance, and delivery by international manufacturers and logistics providers often runs on a tight schedule. klarx coordinates crane, access routes, and scheduling from a single source and ensures that the mobile crane is ready when the storage system actually arrives – even if the delivery is postponed at short notice.
For a battery storage facility in Mitterteich, klarx transported two battery storage units from Hamburg port to their final location. Two heavy-haul transports drove the storage systems from Hamburg to Mitterteich, where a 200-ton mobile crane lifted both units directly from the trailer to their positions.
To ensure the semi-trailer and crane could safely access the site, klarx planned the approach in advance and set up the construction site: 240 steel plates as an access road, construction fencing, and site supervision. Route planning, site setup, and crane operations were thus all handled from a single source.
Ready for your next BESS project? We'll plan transport, site access, and crane work together with you.

Our packages clearly outline which services, software features, and pricing conditions you receive.

Rent construction equipment over a flexible term at a fixed rate including insurance and delivery.

The digital solution with which you can rent and extend machines 24/7.

Machines that you need for a period of 1 day to 40 days can be rented quickly and easily from us and delivered to any construction site in Germany.
Want to get to know klarx and find out how you can reduce cost and complexity around construction equipment procurement? Interested in using our software or mobile app to source construction equipment fully digitally, 24/7? Request your personal discovery call today.
Request a discovery callDiscover our blog on rental, construction machinery and trends in the construction industry.
This page was automatically translated from German.