Early Bird 2027Mini excavator at special offer price

#Data Center Construction

klarx for data center construction and data center projects

Data centers are built under maximum time pressure – and every hour of downtime on the construction site costs money. As a general contractor, EPC, or hyperscale builder, you need certified equipment exactly when your construction schedule requires it: from earthwork through structural construction and MEP installation to commissioning. klarx bundles cranes, lifting equipment, temporary power supply, containers, site facilities, and disposal with a single contract partner – with guaranteed availability, complete EHS documentation, and digital cost transparency.

Discovery Call Request a Quote

#01

On-time Delivery Without Breakdown Risk

Short-term machinery replacement and time-critical coordination keep your construction schedule stable – even when disruptions occur.

#02

Certification and EHS Documentation

DGUV-tested machines, operator qualifications, and complete lifting and EHS documentation – audit-ready for every inspection.

#03

One Partner for Your Entire Construction Site

Cranes, aerial work platforms, containers, power supply, waste disposal, and safety equipment from a single contact and contract.

Experience Area

klarx is the solution for general contractors and EPCs in data center construction

You are building colocation or hyperscale data centers, managing the structural construction as a general contractor, coordinating technical building systems as an EPC, or retrofitting existing facilities? Data center construction presents requirements that traditional construction projects do not face: tight milestones, a high proportion of heavy-load and modular assembly, strict safety and access regulations, as well as comprehensive documentation for operators and auditors. klarx knows these requirements from projects throughout Europe and takes on complete equipment procurement for all construction phases – earthwork, structural construction, MEP installation, commissioning, and retrofit.

Whether tower cranes and mobile cranes for the assembly of HVAC modules, generators and switchgear, work platforms and telescopic loaders for installation, temporary power supply, temporary space systems and site facilities, or disposal solutions – with more than 530,000 machines in 275 product categories, you get everything from one source at klarx. In addition to our machine specialists, a dedicated expert team for crane and container projects is at your side, planning crane positions, lifting zones, and assembly concepts together with your site management. Projects can be handled under NDA upon request and in accordance with your operator's safety requirements.

Discovery Call

#01

Crane and Project Expertise

From 3D crane planning through lifting documentation to assembly: Our crane team plans heavy-load lifts for transformers, generators and prefab modules and coordinates trades on site.

#02

Guaranteed Availability

klarx guarantees you the availability of all machines at category level and delivers nationwide to every construction site – even with short-notice changes in requirements.

#03

Cost Control and Transparency

With klarxMANAGER you see deployment times, costs and documents per construction site in real time – plus 1% discount on all orders triggered via the platform.

Collaboration with klarx

#01
die-zusammenarbeit-mit-klarx

klarx Packages

Our packages clearly outline which services, software features, and pricing conditions you receive.

#02
CAT-deltalader-im-abo-mieten-bei-klarx

Construction Equipment Subscription

Rent construction equipment over a flexible term at a fixed rate including insurance and delivery.

#03
klarxMANAGER-baumaschinen-einfach-digital-mieten

klarxMANAGER

The digital solution with which you can rent and extend machines 24/7.

#04
baumaschinen-mit-klarx-mieten

Short-Term Rental

Machines that you need for a period of 1 day to 40 days can be rented quickly and easily from us and delivered to any construction site in Germany.

Data Centers

5 XXL CRANES AT A DATA CENTER

For the construction of a data center in Raunheim near Frankfurt, klarx managed the complete tower crane package over a project duration of 14 months. The scope of services ranged from 3D crane planning to lifting documentation and temporary power supply, as well as EHS coordination and complete logistics and assembly.

A WOLFF 6031.8 Clear, a Liebherr 630 EC-H20, and a Wotan X-treme 8040.20/2 were used. Weather protocols, defined restricted zones, and continuous on-site supervision were part of the integrated lifting concept.

  • Location: Raunheim, Germany
  • Duration: 14 months
  • Scope: Full-service tower crane package
  • Services: 3D crane planning, lifting documentation, temporary power supply, EHS coordination, logistics and assembly
  • Cranes used: WOLFF 6031.8 Clear · Liebherr 630 EC-H20 · Wotan X-treme 8040.20/2

#Expertise

Book a discovery call with our experts

Want to get to know klarx and find out how you can reduce cost and complexity around construction equipment procurement? Interested in using our software or mobile app to source construction equipment fully digitally, 24/7? Request your personal discovery call today.

Request a discovery call
#Resources

Valuable Information, News and Trends

Discover our blog on rental, construction machinery and trends in the construction industry.

#01

Sustainability in the Construction Industry

#02

Construction Trends for 2024

#03

Solar Installation Projects

This page was automatically translated from German.